Published: 2019-05-09 15:02:28 CEST
Arco Vara
Quarterly report

Unaudited consolidated interim report for Q1 2019


KEY PERFORMANCE INDICATORS

In Q1 2019, the group’s revenue was 1.1 million euros, which is 28% less than the revenue of 1.5 million euros from continuing operations in Q1 2018. In Q1 2018, revenue together with the discontinued service segment was 2.1 million euros.

In Q1 2019, the group’s operating profit (=EBIT) was 5 thousand euros and net loss 112 thousand euros. In Q1 2018, the group had operating profit of 91 thousand euros from continuing operations (63 thousands in overall) and net loss of 51 thousand euros.

In Q1 2019, 7 apartments were sold in projects developed by the group (in Q1 2018: 7 apartments and 1 land plot).

In the Q1 of 2019, the group’s debt burden (net loans) increased by 1.7 million euros up to the level of 15.9 million euros as of 31 March 2019. As of 31 March 2019, the weighted average annual interest rate of interest-bearing liabilities was 4.8%. This is a decrease of 0.2 percentage points compared to 31 December 2018.


GROUP CEO’S REVIEW

Q1 neither overperformed nor underperformed the expectations. Arco Vara earned its living from rental and facility management fees of Madrid Blvd building, from license fees of its former service division, and from the sale of some of its apartments in Madrid Blvd building. During the quarter, the group’s cost base decreased after the partial repayment of the bank loan related to Madrid Blvd building, and the subsequent decrease of loan interest rate and interest cost.

The main challenge of the group continues to be the realization of Iztok Parkside project, which is fully constructed and largely presold. The group must be the only developer in Bulgaria who needs an approval from Government of Bulgaria to transfer some land plots of few hundred square meters that are owned by two public institutions to a third public institution, which does not change the land’s purpose. The use of the land plots has already been established by planning documents and eternalized with an asphalt layer. In order to go through the legal process, more than 50 signatures and stamps are needed, the majority of which have been obtained by today. Unfortunately, forecasting the time needed for completing such process is extremely difficult and the management has previously made mistakes in its time estimates.

Other developments have progressed as planned and three important decisions must be made during Q2:

  1. Starting or not starting Stage III of Kodulahe project, depending on the construction price versus forecasted sales revenue. Recently, Arco Vara has raised the prices of the remaining apartments in Stage 2 of Kodulahe project.
  2. Starting or not starting Kodukalda project on Oa street in Tartu, depending on the same considerations.
  3. Receiving the construction permit and starting or not starting Botanica Lozen project, depending on the same considerations.

Residential markets in both Tallinn and Sofia are characterised by certain overheating, as demonstrated by rapid increases of land prices and construction costs. Although banks continue to lend for real estate purchases, there are signs of slowdown both in terms of the number of transactions and the number of new constructions started. Also the consumers are delaying purchase decisions, expecting the prices to fall. Considering the quality of our land reserves, which do not have to be developed at any cost, and minimised overhead, which allow us to remain patient before commencing any new projects, we are in no hurry to start new development projects.

Thus, as a summary of Q1 and outlook for Q2: Arco Vara needs patience rather than new capital or ideas or workforce.


OPERATING REPORT

The revenue of the group totalled 1,051 thousand euros in Q1 2019 (in Q1 2018: 2,147 thousand euros, of which 1,456 thousand euros from continuing operations), including revenue from the sale of properties in the group’s own development projects in the amount of 823 thousand euros in Q1 2019 (in Q1 2018: 1,310 thousand euros).

Most of the other revenue of the group consisted of rental income from commercial and office premises in Madrid Blvd building in Sofia, amounting to 172 thousand euros in Q1 2019 (in Q1 2018: 124 thousand euros). In Q1 2019, all office and commercial spaces together with parking places were rented out.

In Q1 2019, the group had an operating profit of 5 thousand euros. In Q1 2018, the group had an operating profit of 91 thousand euros.

In Q1 2019, construction works continued for Stage II of Kodulahe project, a building with 68 apartments and 1 commercial space. The project is expected to be finalized by the end of 2019. By the publishing date of the interim report, 58 apartments have been presold.

Design works for Stages III-V continued in Q2, scheduled to end in the summer of 2019. Under favourable market conditions, the construction of Stage III is scheduled to start in the autumn of 2019 and the joint construction of Stages IV-V in 2000. The apartment buildings will become ready for final sale in about 1,5 after the construction begins.

In Q1, design works of Oa street plots in Tartu were completed. The plan foresees construction of 4 smaller apartment buildings under Kodukalda project name. The construction is scheduled to start in the summer of 2019.

In Iztok Parkside project in Sofia, construction has been completed. By the publishing date of the interim report, presale agreements for 53 apartments have been concluded. Iztok project consists of three apartment buildings with 67 apartments (7,070 square meters of apartments’ sellable area).

In Madrid Blvd building, out of the 15 apartments previously used for offering accommodation service, 10 have been sold as of the date of this report.

By the date of this report, design works of Botanica Lozen project near Sofia in Bulgaria have been essentially completed. The project foresees construction of 179 homes (apartments and houses), commercial spaces and a kindergarten. Under favourable market conditions, construction may start in the second half of 2019, possibly divided into smaller sub-stages. Considering the nature of terrain on a mountain slope, minimum construction period is 2 years.

As of 31 March 2019 and the date of this report, 4 Marsili residential plots remained unsold in Latvia.


CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME

In thousands of euros3m 20193m 2018
   
Continuing operations  
Revenue from sale of own real estate8231,310
Revenue from rendering of services228146
Total revenue1,0511,456
   
Cost of sales-815-1,016
Gross profit236440
   
Other income915
Marketing and distribution expenses-85-43
Administrative expenses-233-316
Other expenses-4-10
Gain on sale of subsidiaries015
Operating profit/loss591
   
Finance income and costs-117-114
Profit before tax-112-23
Net profit/loss from continuing operatsions-112-23
   
Net profit/loss from discontinued operations0-28
Net profit/loss for the period-112-51
   
Total comprehensive income/expense for the period -112-51
   
Earnings per share from continuing operations (in euros)  
- basic-0.010.00
- diluted-0.010.00
Earnings per share (in euros)  
- basic-0.01-0.01
- diluted-0.01-0.01


CONSOLIDATED STATEMENT OF FINANCIAL POSITION

 In thousands of euros31 March 201931 December 2018
   
Cash and cash equivalents1,6442,327
Investments069
Receivables and prepayments608739
Inventories19,14517,482
Total current assets21,39720,617
   
Receivables and prepayments2025
Investment property11,72112,344
Property, plant and equipment287267
Intangible assets256262
Total non-current assets12,28412,898
TOTAL ASSETS33,68133,515
   
Loans and borrowings12,79212,547
Payables and deferred income4,0923,982
Total current liabilities16,88416,529
   
Loans and borrowings3,9083,985
Total non-current liabilities3,9083,985
TOTAL LIABILITIES20,79220,514
   
Share capital6,2996,299
Share premium2,2852,285
Statutory capital reserve2,0112,011
Other reserves245245
Retained earnings2,0492,161
TOTAL EQUITY12,88913,001
TOTAL LIABILITIES AND EQUITY33,68133,515


 

Kristel Tumm
CFO
Arco Vara AS
Phone: +372 614 4662
www.arcovara.com