Despite the continued difficult external environment, the second quarter and first half of 2022 were overall profitable for the group. The increase in sales revenue also continued, which is largely based on the fulfillment of construction contracts concluded in previous periods.
At the same time, the ongoing uncertainty of material supplies and the rapid increase in input prices have created a situation where planning construction works is very difficult both in terms of time and cost. This, together with the general difficult economic environment, forces both the private and public sector to postpone investments. It is the decrease in the volume of public sector investments, especially in road and infrastructure construction, that in the short and long term has a direct impact on the group's sales revenue, profitability, and the volume of the order book.
The group's sales revenue for the first half of 2022 was 149,256 thousand euros. Compared to the same period last year, sales revenue increased by approximately 27%. The increase in sales revenue is based on the growth of the Buildings segment, the sales revenue of the Infrastructure segment has decreased compared to the same period last year.
The group's gross profitability was 2.1% in the first half of 2022 and 2.5% in the second quarter. The profit of both the first half of the year and the second quarter was earned in the Buildings segment. While the profitability of the Buildings segment has, despite the increase in input prices and material supply problems, improved compared to the same period last year, it is extremely difficult to achieve the same in the Infrastructure segment. The main customer, the Transport Administration, has cancelled several already announced tenders and the volume of this year's investments has been significantly reduced. This significantly affects the result of the segment with high fixed costs.
As of 30 June 2022, the volume of the group’s order book was 220,687 thousand euros, which has decreased by 18% compared to the same period last year.

Condensed consolidated interim statement of financial position

€’00030 June 202231 December 2021
ASSETS  
Current assets  
Cash and cash equivalents4,9679,031
Trade and other receivables60,57448,091
Prepayments8,1814,947
Inventories27,56025,637
Total current assets101,28287,706

Non-current assets
  
Other investments7676
Trade and other receivables8,6239,206
Investment property8,2335,599
Property, plant and equipment17,77417,433
Intangible assets15,08115,051
Total non-current assets49,78747,365
TOTAL ASSETS151,069135,071
   
LIABILITIES  
Current liabilities  
Borrowings17,35316,289
Trade payables68,81057,324
Other payables7,9447,459
Deferred income15,39811,539
Provisions1,395707
Total current liabilities110,90093,318

Non-current liabilities
  
Borrowings6,8247,405
Trade payables3,9874,178
Provisions1,8562,044
Total non-current liabilities12,66713,627
TOTAL LIABILITIES123,567106,945
   
EQUITY  
Share capital14,37914,379
Own (treasury) shares (660)(660)
Share premium635635
Statutory capital reserve2,5542,554
Translation reserve1,6891,948
Retained earnings5,4136,341
Total equity attributable to owners of the parent24,01025,197
Non-controlling interests3,4922,929
TOTAL EQUITY27,50228,126
TOTAL LIABILITIES AND EQUITY151,069135,071


Condensed consolidated interim statement of comprehensive income

€’000 H1 2022Q2 2022 H1 2021 Q2 20212021
Revenue 149,25680,803117,96668,979288,534
Cost of sales(146,075)(78,769)(116,660)(67,580)(284,513)
Gross profit 3,1812,0341,3061,3994,021
      
Marketing and distribution expenses(186)(115)(214)(108)(559)
Administrative expenses(3,118)(1,513)(2,833)(1,362)(6,053)
Other operating income1,85610312792519
Other operating expenses(276)(2)(29)(6)(2,264)
Operating profit (loss)1,457507(1,643)15(4,336)
      
Finance income14679537132958
Finance costs(1,377)(43)(665)(376)(1,320)
Net finance income (costs)(1,231)36(128)(244)(362)
      
Profit (loss) before income tax226543(1,771)(229)(4,698)
Income tax expense(200)(200)(619)(250)(808)
Profit (loss) for the period26343(2,390)(479)(5,506)
      
Other comprehensive income (expense):
Items that may be reclassified subsequently to profit or loss
     
Exchange differences on translating foreign operations(259)(413)406587(475)
Total other comprehensive income (expense) (259)(413)406587(475)
TOTAL COMPREHENSIVE INCOME (EXPENSE)(233)(70)(1,984)108(5,981)
      
Profit (loss) attributable to:     
- Owners of the parent(928)(10)(2,148)(584)(6,310)
- Non-controlling interests954353(242)105804
Profit (loss) for the period26343(2,390)(479)(5,506)
      
Comprehensive income (expense) attributable to:     
- Owners of the parent(1,187)(423)(1,742)3(6,785)
- Non-controlling interests954353(242)105804
Comprehensive income (expense) for the period(233)(70)(1,984)108(5,981)
      
Earnings per share attributable to owners of the parent:     
Basic earnings per share (€)(0.03)(0.00)(0.07)(0.02)(0.20)
Diluted earnings per share (€)(0.03)(0.00)(0.07)(0.02)(0.20)


Condensed consolidated interim statement of cash flows

€’000H1 2022H1 2021
Cash flows from operating activities  
Cash receipts from customers177,608142,892
Cash paid to suppliers(162,328)(124,977)
VAT paid(4,447)(4,387)
Cash paid to and for employees(12,476)(13,075)
Income tax paid(312)(616)
Net cash used in operating activities(1,955)(163)
   
Cash flows from investing activities  
Paid on acquisition of property, plant and equipment(97)(104)
Proceeds from sale of property, plant and equipment322158
Paid on acquisition of intangible assets0(16)
Loans provided(9)(25)
Repayments of loans provided1160
Dividends received60
Interest received64
Net cash from investing activities23977
   
Cash flows from financing activities  
Proceeds from loans received1,8701,418
Repayments of loans received(1,605)(1,243)
Lease payments made(1,790)(1,574)
Interest paid(428)(545)
Dividends paid(391)(2,814)
Other payments(4)0
Net cash used in financing activities(2,348)(4,758)
   
Net cash flow(4,064)(4,844)
   
Cash and cash equivalents at beginning of period9,03112,576
Effect of movements in foreign exchange rates00
Decrease in cash and cash equivalents(4,064)(4,844)
Cash and cash equivalents at end of period4,9677,732


Financial review

Financial performance

Nordecon ended the first half of 2022 with a gross profit of €3,181 thousand (H1 2021: €1,306 thousand) and gross margins that were higher than a year earlier: 2.1% for the first half-year (H1 2021: 1.1%) and 2.5% for the second quarter (Q2 2021: 2.0%). The group’s gross profit for both the first half and second quarter of 2022 was earned in the Buildings segment, which delivered gross margins of 3.8% for the half-year and 3.4% for the second quarter (H1 2021: 2.5% and Q2 20221: 2.8%). The Infrastructure segment’s performance was weaker than in the same period last year, with negative gross margins for both the first half-year and second quarter: (6.4)% and (0.3)%, respectively (H1 2021: (0.5)% and Q2 2021: 3.2%). The Buildings segment has been able to increase its profitability compared with a year earlier despite growth in input prices and disruptions in the supply of materials. For the Infrastructure segment, improvement of profitability is much more difficult. Its largest customer, the Transport Administration, has cancelled several announced procurements and made significant cutbacks in its investments in 2022. This has had a significant effect on the performance of our Infrastructure segment whose fixed costs are high. 
The group’s administrative expenses for the first half of 2022 amounted to €3,118 thousand. Compared with the same period last year, administrative expenses grew by around 10% (H1 2021: €2,833 thousand) due to general growth in the cost of goods and services. The ratio of administrative expenses to revenue (12 months rolling) declined year on year, decreasing to 2.0% (H1 2021: 2.2%).
The group ended the first half of 2022 with an operating profit of €1,457 thousand (H1 2021: an operating loss of €1,643 thousand). EBITDA for the period amounted to €3,158 thousand (H1 2021: €92 thousand). According to the restructuring plan approved by the creditors of Swencn AB, the claims of the entity’s creditors are to be settled to the extent of 25%. As a result, the group recognised other income of €1,560 thousand in the reporting period.
The group’s finance costs were significantly affected by the write-down of a loan provided to the group’s Ukrainian associate V.I. Center TOV by €825 thousand. Due to the lack of more recent reliable data, the fair value of the loan was measured using the inputs of the valuation reports issued at the end of 2021 by an internationally recognised independent appraiser. The asset had to be written down due to the time factor, i.e. the deferral of the completion of the development projects. 
The group earned a net profit of €26 thousand (H1 2021: a net loss of €2,390 thousand). The net loss attributable to owners of the parent, Nordecon AS, was €928 thousand (H1 2021: a net loss of €2,148 thousand).

Cash flows

Operating activities produced a net cash outflow of €1,955 thousand the first half of 2022 (H1 2021: an outflow of €163 thousand). Operating cash flow is increasingly affected by the need to make prepayments to materials suppliers, which have grown due to spikes in materials prices and continuing supply disruptions, in a situation where the contracts signed with both public and private sector customers do not require them to make advance payments. Cash inflow is also reduced by contractual retentions, which extend from 5 to 10% of the contract price and are released at the end of the construction period only. 
Investing activities resulted in a net cash inflow of €239 thousand (H1 2021: an inflow of €77 thousand). The largest items were payments made to acquire property, plant and equipment of €97 thousand (H1 2021: €120 thousand) and proceeds from the sale of property, plant and equipment of €322 thousand (H1 2021: €158 thousand). 
Financing activities generated a net cash outflow of €2,348 thousand (H1 2021: an outflow of €4,758 thousand). The largest items were cash flows related to loans and leases. Proceeds from loans received totalled €1,870 thousand, consisting of the use of the overdraft facility and development loans (H1 2021: €1,418 thousand). Repayments of loans received totalled €1,605 thousand, consisting of regular repayments of long-term investment and development loans (H1 2021: €1,243 thousand). Lease payments totalled €1,790 thousand (H1 2021: €1,574 thousand). Dividends paid in the first half of 2022 amounted to €391 thousand (H1 2021: €2,814 thousand).
The group’s cash and cash equivalents at 30 June 2022 totalled €4,967 thousand (30 June 2021: €7,732 thousand). 

Key financial figures and ratios

Figure/ratioH1 2022H1 2021H1 20202021
Revenue (€’000)149,256117,966136,798288,534
Revenue change27%(14)%36%(2.5)%
Net profit (loss) (€’000)26(2,390)1,419(5,506)
Net profit (loss) attributable to owners of the 
parent (€’000)
(928)(2,148)(156)(6,310)
Weighted average number of shares31,528,58531,528,58531,528,58531,528,585
Earnings per share (€)(0.03)(0.07)0.00(0.20)
Administrative expenses to revenue2.1%2.4%2.8%2.1%
Administrative expenses to revenue (rolling)2.0%2.2%2.8%2.1%
EBITDA (€’000)3,158923,694(797)
EBITDA margin2.1%0.1%2.7%(0.3)%
Gross margin2.1%1.1%4.4%1.4%
Operating margin1.0%(1.4)%1.5%(1.5)%
Operating margin excluding gain on asset sales0.9%(1.4)%1.5%(1.6)%
Net margin0.0%(2.0)%1.0%(1.9)%
Return on invested capital1.2%(2.1)%3.3%(6.5)%
Return on equity0.1%(6.9)%4.1%(16.8)%
Equity ratio18.2%22.6%25.8%20.8%
Return on assets0.0%(1.7)%1.1%(4.1)%
Gearing37.2%31.4%26.8%28.3%
Current ratio0.910.971.000.94
 30 June 202230 June 202130 June 202031Dec 2021
Order book (€’000)220,687269,448187,018266,856


Performance by geographical market

The group’s revenues from outside Estonia have decreased. In the first half of 2022, foreign markets accounted for around 3% of total revenue. Due to Russia’s military invasion of Ukraine, full-scale operations of the group’s Ukrainian subsidiary Eurocon Ukraine TOV have been temporarily suspended: in the second quarter the subsidiary continued work on one building project in Kiev. Ukrainian revenues for the period amounted to €578 thousand. The group did not generate any revenue and had no ongoing construction contracts in the Swedish market. The group also operates on a project basis in Latvia where it was building a wind farm in the reporting period. 

 H1 2022H1 2021H1 20202021
Estonia97%96%88%94%
Latvia2%0%0%1%
Finland1%3%5%3%
Ukraine0%1%1%2%
Sweden0%0%6%0%


Geographical diversification of the revenue base is a consciously deployed strategy by which we mitigate the risks resulting from excessive reliance on a single market. However, conditions in some of our chosen foreign markets are also volatile and noticeably affect our current results. Increasing the contribution of foreign markets is one of Nordecon’s strategic goals.

Performance by business line

Segment revenues

The group’s revenue for the first half of 2022 was €149,256 thousand, roughly 27% larger than a year earlier when revenue amounted to €117,966 thousand. Revenue growth was attributable to the revenue of the Buildings segment, which grew by 40%. The revenue of the Infrastructure segment decreased by 21%. The decline in revenue generated by the Infrastructure segment is attributable to the cutback in investments made by the largest customer, the Transport Administration, due to the spike in input prices triggered by the impacts of the war in Ukraine. 
The low volumes of infrastructure construction that are affecting the entire construction market also influence the group’s revenue structure. In the first half of 2022, the Buildings and the Infrastructure segment generated revenue of €128,430 thousand and €20,703 thousand, respectively. The corresponding figures for the first half of 2021 were €91,557 thousand and €26,217 thousand. 

Revenue by operating segmentH1 2022H1 2021H1 20202021
Buildings84%78%81%75%
Infrastructure16%22%19%25%


Subsegment revenues

In the Buildings segment, the revenues of all subsegments grew compared with the same period last year. The revenue contributions of the apartment, the commercial and the public buildings subsegments were practically equal while the revenue contribution of the industrial and warehouse facilities subsegment was somewhat smaller.
The largest projects under construction in the commercial buildings subsegment were the LEED Gold compliant Alma Tomingas office building in Ülemiste City in Tallinn and an IKEA store in Rae rural municipality near Tallinn.
The revenue of the public buildings subsegment has increased significantly year on year. The largest projects in progress during the period were construction works in the Medical Campus of the Tartu University Hospital in Tartu, the construction of the main building of the Estonian Internal Security Service in Tallinn and the design and construction of storage facilities and utility networks for the Centre for Defence Investment in Harju county.
The apartment buildings subsegment earns most of its revenue from the construction of apartment buildings for third parties. During the period under review, the largest of them were the design and construction of the first two phases of the Kalaranna quarter in Tallinn and the design and the construction of the Tiskreoja and Luccaranna housing estates on the western border of Tallinn. 
The volume of our own development operations (reported in the apartment buildings subsegment), however, continues to grow as well. We have development projects in both Tallinn and Tartu. During the period, work continued on the construction of the Mõisavahe Kodu housing estate in Tartu (https://moisavahe.ee) and the development of plots for Kivimäe Süda, a new housing estate in the Nõmme district in Tallinn, where we have started preparations for phase 2 – the construction of an apartment building (https://www.kivimaesuda.ee/en). We also started the design of the Seiler Quarter housing estate in Pärnu (https://seileri.ee). The period’s revenue from own development projects amounted to €6,335 thousand (H1 2021: €0). In carrying out our own development activities, we carefully monitor potential risks in the housing development market.
The revenue contribution of the industrial and warehouse facilities subsegment has grown compared with the first half of 2021. The subsegment’s largest ongoing project is the construction of a factory complex for the dairy company E-Piim in Paide but there are also numerous smaller projects such as the construction of a production building at Kurna tee in Harju county.

Buildings segmentH1 2022H1 2021H1 20202021
Apartment buildings30%30%27%29%
Public buildings28%30%34%28%
Commercial buildings26%31%30%29%
Industrial and warehouse facilities16%9%9%14%


In the Infrastructure segment, the largest revenue contributor is still road construction and maintenance although its revenue and proportionate contribution have decreased year on year. During the period, the subsegment’s revenue resulted from the performance of contracts secured in 2021, the largest of which were the construction of 2+2 passing lanes on the Kärevere–Kardla section of the Tallinn–Tartu–Võru–Luhamaa road and the design and construction of the outdoor space around Terminal D in Old City Harbour in Tallinn, as well as smaller contracts of €2-3 million each signed in 2022. We also continued to deliver road maintenance services in Järva county. 
The group has won several contracts for the construction of small harbours. During the period, work was done on the expansion of quays in Roomassaare harbour and the construction of the Kalana yacht harbour, which accounted for a major share of the specialist engineering revenue. The revenue of the other engineering subsegment resulted mostly from the construction of the Vanessa wind farm in Latvia.

Infrastructure segmentH1 2022H1 2021H1 20202021
Road construction and maintenance81%86%80%87%
Other engineering14%4%14%6%
Specialist engineering5%5%5%4%
Environmental engineering0%5%1%3%


Order book

The group’s order book (backlog of contracts signed but not yet performed) stood at €220,687 thousand at 30 June 2022, reflecting an 18% decrease year on year. In the first half and second quarter of 2022, we signed new contracts of €89,661 thousand and €26,494 thousand, respectively (H1 2021: €174,820 thousand and Q2 2021: €69,938 thousand). Russia’s military invasion of Ukraine and the consequent sanctions on Russia and Belarus have disrupted the supply of building materials, particularly metal, wood and oil-based products, which is also affecting the prices of relevant materials. The surge in materials prices has caused a sharp increase in the costs of development projects as well as the postponement of new projects. As mentioned in the previous chapters, the volume of investments made by the Transport Administration has decreased substantially. This has affected the group’s order book through a decline in the order book of the Infrastructure segment. 

 30 June 202230 June 202130 June 202031 Dec 2021
Order book (€’000) 220,687 269,448 187,018266,856


The proportions of the two main operating segments in the group’s order book have not changed substantially: the Buildings segment still dominates, accounting for 85%, while the Infrastructure accounts for 15% of the total order book (30 June 2021: Buildings: 79% and Infrastructure: 21%). Compared with 30 June 2021, the order books of the Buildings and the Infrastructure segment have decreased by 9% and 21%, respectively.
The largest contracts secured in the second quarter were:

  •  the design and construction of storage facilities and associated utility networks for the Centre for Defence Investment in Harju county, Estonia, with an approximate cost of €14,600 thousand;
  •  the design and construction of the Männiku commercial building in Kandiküla in Tartu, Estonia, with an approximate cost of €5,900 thousand.
  •  the construction of foundations for turbines in a wind farm being built near the city of Telšiai, Lithuania, with an approximate cost of €3,000 thousand.

Based on the size of the group’s order book, including the share of work to be performed in 2023, management expects that in 2022 the group’s revenue will grow compared with 2021. The uptrend in the prices of materials, energy carriers and labour costs will continue to increase input prices and pressure on profit margins. In an environment of stiff competition, we have avoided taking unjustified risks whose realisation in the contract performance phase would have an adverse impact on the group’s results. To mitigate input price risk, we have been signing cost-plus contracts with private sector customers (contracts with an open book arrangement under which we can invoice the customer based on the actual costs incurred plus an agreed margin). Our focus remains on cost control as well as pre-construction and design activities, where we can harness our professional competitive advantages.

People

Employees and personnel expenses

The group’s average number of employees in the first half of 2022 was 671, including 437 engineers and technical personnel (ETP). Headcount decreased by around 1% year on year. 

Average number of employees at group entities (including the parent and the subsidiaries):

 H1 2022H1 2021H1 20202021
ETP437426442434
Workers234254265251
Total average671680707685


The group’s personnel expenses for the first half of 2022, including all taxes, totalled €12,936 thousand compared with €12,020 thousand in the same period last year. Personnel expense have increased by around 8% in connection with growth in wages and salaries.
The service fees of the members of the council of Nordecon AS for the first half of 2022 amounted to €75 thousand and associated social security charges totalled €25 thousand (H1 2021: €75 thousand and €25 thousand, respectively).
The service fees of the members of the board of Nordecon AS amounted to €202 thousand and associated social security charges totalled €67 thousand (H1 2021: €182 thousand and €60 thousand, respectively).

Labour productivity and labour cost efficiency

We measure the efficiency of our operating activities using the following productivity and efficiency indicators, which are based on the number of employees and personnel expenses incurred:

 H1 2022H1 2021H1 20202021
Nominal labour productivity (rolling), (€ ‘000)470.0403.3385.7420.8
Change against the comparative period, % 16.5%4.6%20.0%(0.5)%
     
Nominal labour cost efficiency (rolling), (€)12.810.99.711.5
Change against the comparative period, %17.6%12.7%3.7%5.5%

The group’s nominal labour productivity and nominal labour cost efficiency improved year on year, mainly due to revenue growth. 


Andri Hõbemägi
Nordecon AS
Head of Investor Relations
Tel: +372 6272 022
Email: andri.hobemagi@nordecon.com
www.nordecon.com

Attachments



NCN investor presentation Q2_2022.pdf
Nordecon_Interim_report_Q2_2022.pdf